From: route@monster.com
Sent: Friday, May 06, 2016 11:20 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Right Of Way
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ron Barnes 7941 Inishmore Way,
Indianapolis, IN. 46214 PH: 317.714.7103 Barnesron2@gmail.com Summary Service-oriented Field Engineer with a
15-year background in Telecommunications and Wireless industry. Core
competencies include Technical, Engineering, and Management as well as
excellent communication and time management skills. Able to handles all tasks
with accuracy and efficiency. Skills
Experience
·
Ran AC and DC Commercial Power from the meter box/Power Pole to the
power plant from the power plant to the Ray Cap/ External PDU. ·
Inspect or test lines or cables, recording and analyzing test results,
to assess transmission characteristics and locate faults or malfunctions. ·
Measure signal strength at utility poles, using electronic test
equipment. ·
Complete forms by company procedures.
·
Test and turn the ALU, Cisco router equipment with members from the
UK. ·
Plan layout of electric power generating plants or distribution lines
or stations. ·
Operate computer-assisted engineering or design software or equipment
to perform engineering tasks. ·
Backhaul/EBH routing between the 7705 and the 7750 at the switch ·
Had to troubleshoot layer 0 and layer 1 (physical fiber) as well as
layer 2 (VLAIN) ·
Ran fiber from the DMARC to the 7705 ·
Installed multi-mode SFP ·
Ran short and long fiber testing to check for frame loss and to
verify VLAIN (Layer 2) connectivity ·
Intergraded fiber backhaul service during the maintenance window ·
Assist engineering and other personnel to solve operating problems
·
Responsible for migrating cabling to the router and installing the T1. ·
Cabling, verifying, validating, testing, and troubleshooting issues
and correcting issues before the M2. ·
Encouraged and directed to complete various tasks on each cell site
and QA completed to prevent revisits. ·
Completed and reviewed team ATP Reports at the completion. ·
Added 48-volt battery stream to the redundancy on the Sprint 2.5 ·
Microwave backhaul was established for COW deployment on special
events ·
Backhaul service was created via microwave shot to the nearest
macrocell site
·
Responsible installation of routers, Loading software, and
configuring files. ·
Migrated and Integrated cell site as well as addressing fiber and
filter issues. ·
Assemble, operate, and maintain field and laboratory testing,
measuring, and mechanical equipment, working as part of a crew when required. ·
Adjust or repair testing, electrical, or mechanical equipment or
devices.
·
Use computers for various applications, such as database management or
word processing. ·
Set up and manage paper or electronic filing systems, recording
information, updating paperwork, or ·
Analyze applicants' financial status, credit, and property evaluations
to determine the feasibility of granting loans. ·
Explain to customers the different types of loans and credit options
that are available, as well as the terms and conditions.
·
Collect and analyze data to detect deficient controls, duplicated
effort, extravagance, fraud, or non-compliance with laws, regulations, and management
policies. ·
Supervise auditing of establishments, and determine the scope of
investigation required. ·
Worked with the4G NIC to integrate LTE DUL's and DBA on the Ericsson
project. ·
Collaborated with the 3G & 4G NIC to integrate CDMA1900 & 800
DUL and DBA systems on Ericsson equipment
·
Managed and supervised a team of six (6) Site Acquisition Specialists
for Sprint Network Vision project aka “Leapfrog”. ·
Collaborate on projects with other professionals, such as lawyers,
accountants, or public relations experts. ·
Coordinate due diligence processes and the negotiation or execution of
purchase or sale agreements. ·
Managed the
productivity of450 sites to obtain the leasing, permitting, and right of way
to receive the notice to proceed and or executed lease signed consents and
verification of notices that adhere to the guidelines of the terms and
agreement.
·
Responsible for obtaining leasing, permitting and utility right of
way for 75 to 100 micro cell sites throughout the New York market. Updating master schedule and
ensuring projects are completed on the client's schedule. ·
Negotiate leases, consents, notices and right of way by working
closely with landlords, and service clients. ·
Consult with users, administrators, and engineers to identify
business and technical requirements for proposed system modifications or technology purchases. ·
Prepare and review operational reports and schedules to ensure
accuracy and efficiency.
·
Documenting site information for available spacing for cell site
modifications and new builds. ·
Performed Assurance work on all radio interface, interpret alarms and
proactively identify and implement repairs and restoration. ·
Build, calibrate, maintain, troubleshoot, or repair electrical
instruments or testing equipment. ·
Collaborate with electrical engineers or other personnel to identify,
define, or solve developmental problems. Education
Certifications ·
Safety Equipment Certification -Infenera Basic Skills Training April 2015 ·
Installation Certification -Nokia September 2014 ·
Construction/OSHA Certifications, 10-Hour,
June 2014 ·
First Aid, CPR, and AED Certification- - American Red Cross, June 2014 ·
WIFI Certification-Samsung-MMBS/BSM tml, June 2014 ·
Ericsson Basic Technique Install Certification –EMAS-August, 2015 ·
Ericsson WCDMA (UMTS) RBS Commissioning -EMAS-August 2015 ·
Ericsson LTE Commissioning Certification- EMAS-August, 2015 ·
Smart Laptop Certification-August, 2015 Additional Information ·
Conducted professional meetings, conferences, and discussions with
management, co-workers, techs, and small business owners, clients, customers, engineers,
subcontractors, suppliers, vendors, jurisdictions with the web, and phone access. ·
Organized, flexible, willing to travel, detail oriented, and
multi-tasking and problem-solving skills. ·
Exceed bottom-line goals, processed time sensitive information ·
Offered development procedure. ·
Reviewed Resumes and conducted interviews, prospective co-workers. ·
Controlled all project deliverable effectively and efficiently.
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|